FPSO Hull Project Engineering Service

Airswift View all jobs

  • Nantong, Jiangsu
  • Contract
  • Full-time
  • 1 month ago
Production : ~ 75 Kbopd operated production from one FPSO (Kaminho) with 2 production subsea loops, 2 Water injection Lines and one Gas injection line ( 7 production wells, 4 WI wells, 2 GI wells). Well performance: - Responsible for preparing production wells first start up in term of ramp up and targets for production, water and gas injection - Responsible for preparing the wells start up procedures - Responsible for developing and deploying all tools related to well monitoring and analysis including but not limited to DOF, Gap/Prosper - Responsible for Performing periodical prognosis and update of well potentials, either on individual basis or taking the facilities network constraints into account and well tests results. - Responsible to prepare the load shedding matrix taking into account all scenario for water management, flaring management, gas management, power management, GHG management - Responsible for Validating the definition of the Wells potential and production targets, sets in conjunction with Reservoir and Drilling & Completions well production/injection objectives, and assists Site as necessary to meet the objectives. Optimises and assists Site for production/injection optimisation. - Contributes to the definition of annual production budget and closure forecast exercise for wells and network operations. - Participates to the development of Ramp-up strategy and develops/follows corresponding programs and operating instructions for wells. - Assists Site to ensure that Well Integrity is maintained - Controls the quality of the well production data and provides relevant information to all concerned parties contributing to the accuracy of production/injection data. Participate in well monitoring activities - Performs diagnosis studies, in depth analysis and proposed curative actions for underperforming wells cooperation with Reservoir, Drilling & Completion and Field Operations entities and initiates/follows intervention requests as necessary to meet production budget. - Provides inputs for the state of requirements of well interventions, quantifying expected costs, shortfalls and/or oil gain for well proposals (in conjunction with Reservoir Management, Drilling & Wells and Field Operations) - Ensures that relevant Company Rules related to his activities are correctly implemented. - Initiates and follows relevant derogation requests as necessary Flow Assurance: - Responsible for operational and technical support to Field Operation teams through Flow Assurance studies and expertise - Responsible for preparing required Flow Assurance documentation for Kaminho start up and operations (Hydrate Prevention Philosophy, Pigging Philosophy, pigging procedure & pigs datasheet, preservation sequence & procedures, Operating Envelopes, Hot oiling...). - In collaboration with the Production Chemistry team, ensure all deposits (including sand and asphaltenes) related flow issues are adequately addressed to minimize process upsets - Responsible for Flow Assurance studies related to performance actions (Well performance, Reliability, Task Forces), modification requests, and derogations requests when required - Responsible for developing and deploying all tools necessary for flow assurance monitoring (Olga Model, LEDA, OCW…

Airswift